With effect from 1 October 2015, in England, a new building regulation - Part Q (Security - Dwellings) - has been introduced. This will apply to all new dwellings on a site, including those formed by a material change of use. The new provisions are broadly similar to those under 'Secured by Design' and NHBC Standards. The supporting guidance can be found in new Approved Document Q 2015 edition (Security - Dwellings).
Optional Requirements - Part G2 and Part M4 - Dwellings
With effect from 1 October 2015 the Building Regulations in England are amended with the introduction of 'optional requirements' in respect of Part G2 (Water Efficiency) and Part M4 (Access to and use of dwellings). These optional requirements impose a higher level of provision than the Building Regulations default requirements, but will only apply where they are specified as a condition of planning.
A planning condition may specify a proportion or all of the dwellings on a site must comply with an optional requirement. Optional requirements, so specified, are enforceable by the building control body.
The duty to tell the building control body that an optional requirement has been imposed falls on the person carrying out the work, this may be the developer, builder or applicant.
Part G2 (Water efficiency)
The default requirement for Part G2 (Water efficiency) remains at 125 litres per person per day.
A more stringent optional requirement (requirement 36(2)(b)) has been introduced which is set at 110 litres per person per day and applies where specified as a condition of planning.
Guidance on how to comply with both the default and the optional requirement can be found in the new Approved Document G 2015 edition (Sanitation, hot water safety and water efficiency). The guidance now includes for a 'water fittings' approach in addition to the existing 'water calculator' approach.
Part M4 (Access to and use of dwellings)
Access provisions for new dwellings are divided into three categories.
The English and Welsh Government have confirmed that in their opinion commencement of work would usually be marked by work such as;
These optional requirements apply when specified as a condition of planning.
Supporting guidance on how to meet both the default and optional requirements can be found in the new Approved Document M 2015 edition (Volume 1 Dwellings).
The guidance for Category 1 dwellings remains broadly similar to that contained in ADM 2004 edition (as amended 2004 and 2013).
Guidance for non-residential buildings is now contained in Approved Document M 2015 edition (volume 2 - Buildings other than dwellinghouses). No changes have been made in respect of non-residential buildings.
Transitional Provisions - England
The new Part Q does not apply to building work that is subject of an initial notice, amendment notice, building notice or full plans submission served before 1 October 2015, provided that the work is commenced on site before 1 October 2016. (see definition of 'commencement of work' below)
The changes to Part G2 and Part M4 do not apply to building work that is subject of an initial notice, amendment notice, building notice or full plans submission (relevant notice) served before 1 October 2015.
Where a relevant notice has been served for the building work prior to 1 October 2015, planning conditions attempting to apply any of the building regulations optional requirements to the work will not be enforceable by the building control authority.
You should inform the local authority planning department should this situation arise, as these planning conditions may still be enforced directly by the local authority planning department. In such cases, it would not be the statutory requirement under the Building Regulations that may be enforced, but rather the supporting guidance for the optional requirements. The supporting guidance is published in Approved Document G 2015 (Sanitation, hot water safety and water efficiency) and Approved Document M 2015 (Volume 1 Dwellings).
What is Commencement of Work - England and Wales
The English and Welsh Government have confirmed that in their opinion commencement of work would usually be marked by work such as;
In their opinion, the following sorts of work would not be likely to constitute the commencement of work;
In some cases applications will be in respect of a number of buildings on a site, for example a number of houses. In such cases it is the commencement of work on the first of the buildings within the application which determines whether all the building work can take advantage of the transitional provisions, not each individual building.
Stay ahead of the competition with the latest technical news and updates.
Find out moreTo help you interpret and apply the NHBC Standards we produce Technical Guidance Documents on the page below.
Find out moreNHBC is uniquely placed to offer relevant, best practice technical training.
View coursesYour essential guide to house building from foundations to roofs and finishing.
Read moreTechnical queries and quotes
Any technical information contained on this website is produced by NHBC as guidance solely for all our builder customers as to how to interpret the technical requirements in relation to the warranty cover provided by NHBC under its Buildmark, Buildmark Choice, Buildmark Link, Buildmark Solo, Buildmark Connect or any similar product from time to time. It has not been created or intended for distribution or use outside of that purpose. The technical information contained on this web page does not constitute advice and is not to be relied upon by any third party. Nothing on this web page is intended to, nor should it be taken to, create any legal or contractual relationship. Any third party who chooses to rely upon the information contained on this web page shall do so entirely at their own risk and NHBC accepts no duty of care or liability, however caused, in connection with its use or reliance by any third party.